INFORMS Open Forum

2017 INFORMS RAS Problem Solving Competition

  • 1.  2017 INFORMS RAS Problem Solving Competition

    Posted 06-15-2017 10:06
    Dear colleagues and friends,
     
    This is a reminder on the 2017 INFORMS RAS Problem Solving Competition registration. Please see more information at our website http://connect.informs.org/railway-applications/awards/problem-solving-competition. Please also help forward this reminder to anyone who may be interested. Thank you very much.

    ----------------------------------

     
    ANNOUNCING:
     
    2017 RAS Problem Solving Competition: 

     Applying Advanced Analytics to Railroad Problems for Fun and Prizes!

    1st Prize   $2,000
    2nd Prize  $1,000
    3rd Prize  $750

    Data Analytics for Railroad Empty-to-Load Peak Kips Prediction
     
     Peak kips denotes the total vertical force a wheel imposes on the rail. A "Kip" is a unit of force that is equal to 1,000 pounds-force , and it can be measured by track-side detectors. The higher the peak kips, the more damage will be imposed to both the wheels and tracks. Railroads use this measure to detect whether there are any defects in either the tracks or the wheels. An alarm will be triggered if the peak kips value is above or equal to 90, and the involved cars need to be set out for inspection and repair (if necessary) either immediately or at the next available repair location. Although immediate action is not required for wheels with peak kips values close to 90, the damage to tracks and wheels might deteriorate (and the peak kips of a defective wheel may further increase) if the defective wheels are not fixed in time.

    However, setting out a car when it is loaded will cause a lot of loss to railroad company. The shipment might get delayed and the network traffic might suffer from unnecessary disruptions. Therefore, the railroad has an incentive to proactively identify problematic wheels/cars and exclude them from being used for future shipments. This project aims at building a predictive model which can be used to project the peak kips of a currently empty car when it is used under the next loaded status. This implies that the projection will be calculated when the car is empty. This model will help the railroad company exclude the problematic wheels/cars from the next trip.

    Visit the competition web site for complete details: http://connect.informs.org/railway-applications/awards/problem-solving-competition



    ------------------------------
    Yanfeng Ouyang
    University of Illinois at Urbana-Champaign
    ------------------------------